URVI / TECHNICAL LIBRARY

Engineering Resources

Technical checklists and planning guidance to help prepare clear, actionable communication and telemetry requirements.

Start with the right engineering questions.

Practical planning checklists for RF, industrial interfaces and monitoring. These are general engineering guides; the applicable design and regulatory requirements depend on the particular project.

01

Industrial Wireless RFQ Checklist

What to provide before requesting a wireless industrial data link.

  1. The equipment manufacturer/model and the interface at both ends (RS232, RS485 or Ethernet).
  2. The communication protocol, baud rate, frame format, polling interval and timing constraints.
  3. The site-to-site distance, mounting height, and whether clear line of sight exists.
  4. Existing power availability, enclosure restrictions and outdoor exposure.
  5. Required topology: point-to-point or multiple remote stations.
  6. Local safety and control consequences if communication is interrupted.
02

Outdoor RF Link Planning Checklist

Inputs for a realistic fixed outdoor radio link assessment.

  1. Coordinates or accurate locations of each site, approximate antenna mounting heights.
  2. Obstruction details, local terrain and available tower/roof structures.
  3. Data capacity requirement, link availability goal and network interface.
  4. Preferred operating bands, licence status and any local interference concerns.
  5. Cable routing, surge protection, grounding and power arrangements.
03

RS485 Integration Preparation

Essential inputs for a reliable industrial serial communication retrofit.

  1. Slave IDs, Modbus function usage or a description of the proprietary protocol.
  2. Existing termination, biasing, cable length, shielding and grounding.
  3. Bus topology, master polling arrangement and device response times.
  4. Isolation requirements, transient exposure and interface connector pinout.
  5. Gateway timeout, buffering and message integrity handling for wireless transport.
04

Environmental Logging Planning

A practical checklist for sensor and datalogger specification.

  1. List of monitored variables, sensors, measurement units and expected accuracy.
  2. Sampling interval, historical retention, availability and alarm requirements.
  3. Physical sensor placement, cable routes and environmental protection.
  4. Communication interfaces, offline storage behaviour and clock synchronization.
  5. Power budget, battery autonomy and solar charging where applicable.

Ready to send an engineering enquiry?

The RFQ form lets you capture equipment, interfaces, site details and application requirements.

Request Technical Consultation / RFQ  →